Twitter and Mastodon are micro-blogging platforms. The problem with micro-blogs, and with short interactions in general, is that everybody can proceed to project onto your words whatever they like. So at some point I often feel the need to explain myself with more words, in an “actual” blog like this one.
Waste in scrum processes
Hypothesis: the moment a team adds the requirement that each PR/commit should be related to a Jira issue, it will start accumulating even more tech debt than before.
We notice that one of the dependencies of our project has been marked as “abandoned” and we need to upgrade/switch to something else. When helping a new co-worker join the team, we find out that some crucial steps aren’t documented in the README. The test framework hasn’t been updated for some time, and upgrading means we have to rewrite some test setup code.
These are things that just happen to our projects from time to time. Many developers won’t go ahead and make the necessary changes. Being part of a “scrum process” they will:
- Create an issue in the backlog
- Bring the issue to the attention of the decision maker
- Wait for the decision maker to assign it to a future sprint
Finally, once the issue has been assigned to a sprint, it needs to be refined. So a group of people that is often too large starts to talk about and describe what needs to be done. Why? Because scrum tradition prescribes that every person on the team should be able to pick up the issue. I don’t think that’s true at all; we’re just wasting time explaining everything to everyone, while often only 2 people are going to pick it up.
In the end we have to vote for the number of story points that we’re going to assign. This magic number has no specific meaning. If we try to describe what such a point represents, we get different answers, even within the same team:
- “It’s definitely not how much time we spend on it” (because we don’t want it to be an estimate)
- “It’s how complex we think this is” (unfortunately we all have different ideas about what “complexity 3” means)
- “We can do about 50 points of these in each sprint” (so it is an estimate after all; given we have two weeks, we can do 50 of them, so each point represents 2 weeks divided by 50 of our time)
Don’t get me wrong, it’s good to think about how much time something will likely take and use a rough estimate to decide if you want to start working on it. It’s just that we are guessing, and we can have huge surprises while we are actually doing the work. Or the opposite happens: we are over-complicating things in the refinement stage and it turns out the actual work was so easy, we get 5 points for the price of 1…
In both cases, a big part of the preparation phase is just a waste of time and energy. I’m certain that many scrum teams could do much, much more if they would let go of wasteful practices like those that “official scrum” or similar project management techniques prescribe.
How to deal with technical debt in a sprint
Back to the original point about technical debt. From time to time developers will notice something about the code base that really needs to be improved, something that is not part of any feature anybody is working on, just “general maintenance” or “developer experience”, and so on. Developers need to do this work because they have to battle the forces pulling the project downward. If they do not continuously do that, one day the project will be beyond repair. Yet, the scrum process prescribes that no work be done in the sprint that is not on the board. So an issue has to be created, and we jump back into the project management waterfall.
At this point a developer have several options, each of which appeared several times in the comments to my bitter tweet:
- They can follow the process because they have to. There are strict requirements, maybe an ISO-standard, that have to be enforced. No way around it. So first they create an issue, and wait for it to be assigned to a sprint.
- In some teams they wouldn’t have to wait, they can pick it up inside the sprint. But only if it’s small, “a 1” or “a 2”, because more would “endanger” the sprint.
- They can play the process, and do general improvements as part of the current ticket they are working on (but these are now unrelated changes).
- They can commit t